Sunday, April 04, 2010

bathroom adventures

Mom is in Europe with her 4 sisters.  We are trying to finish the gd bathroom before she gets home.  Got the Schluter System for the shower stall and some great, cheap tiles from the ReStore and I am tiling the stall and floor, building a bulkhead with a heat lamp/fan and new lighting fixtures, installing a new sink and toilet, vanity, and towel rack/ shelf thing.  Also picked up some liquid enamel from Rona and Ro and I are reglazing the upstairs clawfoot tub and the utility basins downstairs.  So, to recap, what started out as a kitchen reno became kitchen, retaining wall, hallway, bathroom, redo electrical in whole house, repaint whole house, finish trim jobs, and finally, the laundry room.  I need to be done now.  

0 Comments:

Post a Comment

<< Home